Regional Settings
Used for all monetary inputs and results.
Changes flow, mass, density, temperature and solids-specific units.
Engineering calculations normalized internally
US-system values are converted internally to metric SI for calculations.Plant at a glance
Current process configuration
What needs attention?
Plant operating basis
Process train present?
Liquid-side process inputs
Sludge mass balance
0 = calculate from flow ร density ร TS
Sludge stream results
Current thickening / dewatering technology
Thickening
Dewatering
Equipment performance assumptions
These are entered engineering assumptions, not manufacturer guarantees. Replace them with site test data or verified vendor data for final design.
Equipment selection โ select what is actually installed
Process Intelligence calculates each active technology separately and shows energy, polymer, cake production and cost. It does not assume that a technology is present just because it exists in the database.
Decanter duty selection
Decanter โ Thickening
High automation
High capture
Energy: medium/high
Decanter โ Dewatering
Cake TS driven
Polymer commonly used
Energy: high
Decanter โ Thickening + Dewatering
Scenario analysis
Requires actual process basis
Technology comparison
DAF process
DAF calculated consumption
DAF is treated as a real process step. Its recycle flow, pump/compressor energy, coagulant, polymer and sludge production are included in the plant-wide annual balance.
Chemical consumption
Energy model
Hauling, disposal and O&M
Process Intelligence
The point is not just to calculate. Process Intelligence turns plant data into a simple engineering picture: what the plant consumes, where the money goes, which process step is driving the result, and what should be investigated next.
Benchmark framework
| Parameter | Current | Reference / comparison logic | Interpretation |
|---|